Project Details
Status | Finished |
---|---|
Effective start/end date | 15/09/2014 → 14/09/2019 |
Collaborative partners
- King's College London (lead)
- ArcelorMittal Ltd
- Firth Rixson Ltd
- Imperial College London
- Magnesium Elektron Ltd
- Messier-Dowty Ltd
- Timet UK Ltd
- University of Cambridge
- University of Sheffield
- Siemens plc
- Rolls-Royce plc
- Sheffield Forgemasters Engineering Ltd
- Tata Steel UK
Funding
- EPSRC Engineering and Physical Sciences Research Council: £406,113.00