Skip to main navigation Skip to search Skip to main content

Delay Analysis in Full-Duplex Heterogeneous Cellular Networks

  • Leila Marandi
  • , Mansour Naslcheraghi
  • , Seyed Ali Ghorashi*
  • , Mohammad Shikh-Bahaei
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

11 Citations (Scopus)

Abstract

Heterogeneous networks (HetNets) as a combination of macro cells and small cells are used to increase the cellular network's capacity, and present a perfect solution for high-speed communications. Increasing area spectrum efficiency and capacity of HetNets largely depends on the high speed of backhaul links. One effective way that is currently utilized in HetNets is the use of full-duplex (FD) technology that potentially doubles the spectral efficiency without the need for additional spectrum. On the other hand, one of the most critical network design requirements is delay, which is a key representation of the quality of service in modern cellular networks. In this paper, by utilizing tools from the stochastic geometry, we analyze the local delay for downlink channel, which is typically defined as the mean number of required time slots for a successful communication. Given imperfect self-interference cancellation in practical FD communications, we utilize duplex mode (half-duplex (HD) or FD) for each user based on the distance from its serving base station. Further, we aim to investigate the energy efficiency for both duplexing modes, i.e., HD and FD, by considering local delay. We conduct extensive simulations to validate system performance in terms of local delay versus different system key parameters.

Original languageEnglish
Article number8782539
Pages (from-to)9713-9721
Number of pages9
JournalIEEE Transactions on Vehicular Technology
Volume68
Issue number10
DOIs
Publication statusPublished - 1 Oct 2019

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • energy efficiency
  • full duplex
  • half duplex
  • Heterogeneous networks
  • local delay
  • stochastic geometry

Fingerprint

Dive into the research topics of 'Delay Analysis in Full-Duplex Heterogeneous Cellular Networks'. Together they form a unique fingerprint.

Cite this